The transfer station is designed to replace an aging structure built in the 1960’s. The new structure is approximately 22,700 square feet with a cast-in-place foundation and basement which supports the elevated tipping floor. The tipping floor is enclosed with a pre-engineered metal building. Adjacent to the transfer station is a single-story masonry administration building along with a single-story masonry building housing fire pump equipment. A scale along with a scale building are located at the entrance to the site.
Cleatwater, Florida
Design – 2015-2018, Construction – Current
Approximately $17,800,000
City of Clearwater