City of Daytona CMAR Construction Services

Category
Water/Wastewater
About This Project

The facility expansion includes a cast-in-place concrete Deep-Bed Sand Filter structure measuring approximately 209ft x 74ft in plan. The structure includes a Clearwell and a Mudwell. A pre-engineered metal building with open sides is located on top of the Filter structure. Two single-story masonry electrical buildings were designed along with several cast-in-place concrete structures splitting flow throughout the site. A Clarified Liquid Pump Station was also designed and located adjacent to the Filters.

Location:

Daytona Beach, Florida

Dates:

Design – 2018, Construction – Current

Construction Cost:

Approximately $39,000,000

Owner:

City of Daytona Beach