The facility expansion includes a cast-in-place concrete Deep-Bed Sand Filter structure measuring approximately 209ft x 74ft in plan. The structure includes a Clearwell and a Mudwell. A pre-engineered metal building with open sides is located on top of the Filter structure. Two single-story masonry electrical buildings were designed along with several cast-in-place concrete structures splitting flow throughout the site. A Clarified Liquid Pump Station was also designed and located adjacent to the Filters.
Daytona Beach, Florida
Design – 2018, Construction – Current
Approximately $39,000,000
City of Daytona Beach