Due to concerns with the quality of the aging piping, the design incorporates a new header pipe located above the existing piping. The facility requires constant operation of the pumps and piping with only minimal outages thus the proposed piping was installed in phases and at an accelerated timeframe.
Daytona Beach, Florida
Design – 2019, Construction – Current
Approximately $1,500,000
City of Daytona Beach