This unique project involved the design and construction of a building to accommodate reverse osmosis, ultrafiltration and ultraviolet light equipment for a direct potable reuse system being tested. The structure is a pre-engineered metal building approximately 90ft x 60ft in plan dimension. It contains three bays and is primarily open with a 500sf lab and restroom.
City of Daytona Beach, Florida
Design –2016 to 2017, Construction – Completed in 2018
Approximately $2,500,000
City of Daytona Beach