Warning: The magic method QodeInstagramApi::__wakeup() must have public visibility in /var/www/wp-content/plugins/qode-instagram-widget/lib/qode-instagram-api.php on line 90

Warning: The magic method QodeTwitterApi::__wakeup() must have public visibility in /var/www/wp-content/plugins/qode-twitter-feed/lib/qode-twitter-api.php on line 91
Eustis Eastern WWTP Expansion - Wekiva Engineering
 

Eustis Eastern WWTP Expansion

Category
Water/Wastewater
About This Project

The facility expansion will increase the capacity from 0.3 MGD to 1.3 MGD. The expansion included myriad new cast-in-place concrete structures such as an influent screening structure, 100ft diameter process basin, 60ft diameter clarifier, and a chlorine contact chamber with transfer pump station. Other miscellaneous structures included a pre-engineered aluminum chemical storage canopy, single-story masonry electrical building and various site piping supports along with steel access stairs and platforms.

Location:

City of Eustis, Florida

Dates:

Design – 2015 to 2016, Construction – Completed in 2018

Construction Cost:

$6,850,000