Wekiva Engineering was responsible for the construction services of this expansion project. The facility expansion will increase the capacity from 1.5 MGD to 3 MGD. The expansion included the following new structures: Metering Flume, MBR Splitter Box, MBR Membrane tanks with overhead bridge crane, masonry MBR process and administration buildings, chemical storage area pads, UV channel & cascade aerator. The expansion also included the modifications to plant’s existing MBR aerator tank and MBR De-aeration Tank with new cast-in-place channels to be connected to them.
Locust Grove, GA
Design – 2015, Construction – Completed in 2018
Approximately $19,700,000
Henry County Water Authority