The sheet pile retaining wall was designed and constructed on a highly expedited time frame due to the failure of the existing concrete retaining wall. The sheet pile was placed just outside of the existing concrete wall prior to any demolition of the existing wall to ensure the supported soils adjacent to the nearby structures was not disturbed. The sheet pile wall includes a concrete cap beam on top with galvanized fence.
City of Kissimmee, FL
Design – 2018, Construction – Completed in 2018
Approximately $718,000
Toho Water Authority