WWTP B/C Expansion and Rehabilitation Project

Category
Water/Wastewater
About This Project

The facility expansion represents the single largest infrastructure investment performed by the City of Lake Charles and allows for the treatment of 8 MGD daily flow and a peak flow of 35 MGD. The expansion included a new influent pump station constructed via the sinking caisson method, pretreatment structure, multiple oxidation ditches, clarifier splitter boxes, multiple clarifiers, UV disinfection structure, and multiple single-story masonry buildings for electrical and equipment storage.

Location:

City of Lake Charles, Louisiana

Dates:

Design – 2015 to 2016, Construction – Completed in 2018

Construction Cost:

$41,690,000